To ensure the proper functioning of cast-iron manhole covers, it is essential to pay attention to installation quality—specifically, ensuring accurate dimensions, secure mounting, easy opening, and a clean, aesthetically pleasing appearance. Based on the technical standards for inspecting cast-iron manhole covers, the following detailed installation guidelines have been established:
The brickwork for casting iron manhole covers should follow the manhole cover dimensions specified by the design institute, determining either the inner diameter or the length × width (preferably based on actual samples). Alternatively, standard guidelines can be consulted as appropriate. When constructing the well, ensure that the inner diameter of the well opening matches the inner diameter of the manhole cover and grate. Once the installed cover is in place, it should be flush with the surrounding road surface. After pouring and laying the concrete or asphalt around the well base, promptly open and clean the area to prevent mortar or asphalt from bonding the manhole cover permanently to the base—this step is crucial to avoid hindering future access to the cover.
When installing the manhole frame on a cement pavement, cast a 20 cm thick C25 concrete ring beam directly onto the brickwork around the well opening, ensuring it is smoothly finished. It’s crucial to ensure the manhole frame is firmly seated on all four sides, maintaining a perfectly level and stable structure—no loosening allowed. Additionally, pour a 40 cm wide concrete protective ring around the manhole cover (for cement pavements, a 20 cm wide protective ring is also acceptable, reinforced with steel bars). The curing period must exceed 10 days.
To maintain the aesthetic appeal of the manhole covers—ensuring that their surface patterns and lettering remain clear—during asphalt pavement construction, cover the manhole covers with thin metal sheets or apply a protective coating such as waste engine oil to prevent asphalt residue from splashing onto them. For cement pavement work, use plastic film to securely cover the manhole covers, safeguarding them from cement mortar that could otherwise stain or damage the surface patterns and lettering. Alternatively, after completing the day’s construction activities, you can simply rinse the manhole cover surfaces clean with water.
When installing cast-iron manhole covers on asphalt surfaces, be sure to avoid having construction machinery directly roll over the manhole frame. During the overall pavement casting process, leave a slightly larger-than-the-manhole-frame opening in the road surface, to be installed after the asphalt has been laid. (For all-concrete pavements, install the covers after the base course has been compacted with crushed stone.) This ensures proper installation quality, ultimately extending the lifespan of the manhole covers.
Please note the above items—any damage to manhole covers caused by improper installation or vehicle overloading will not be covered under our factory’s warranty, and we will not assume any liability for such issues.